Project

Home / Project

the best company of the year

25 years
of experience

experience makes us confident

HOW WE BECAME BEST AMONG OTHERS?

" We build with great care and also use experienced experts "

We constantly improve through experience, innovation, and skilled execution. Our commitment to quality and attention to detail set us apart in every project. With a dedicated team and modern engineering practices, we continue to deliver results that earn trust and recognition.

Mr. Gopal Prasad Agarwal

Founder & Chairman

Are You Ready To Build New Project With Us?

Your project deserves the right expertise. Reach out to us now and begin your journey with a trusted and experienced team.

Project

Featured Works

Explore some of our standout projects that showcase our commitment to quality and craftsmanship.

Two Lane Road

Construction of Two Lane ROB and Approach portion including Service Road in lieu of level crossings No. 115C at IR km 682/27-683/1 between Jeonathpur to Ahraura Road station on the section of Pt. Deen Dayal Upadhyay Nagar Junction-Allahabad of North Central Railway.

EarthWork 1

Earthwork, blanketing, FOB, Minor Bridges, other service buildings & H/L platform between Bhuteshwar-Chatty stations in connection with 4th line between Mathura-Palwal stations

Earthwork 2

Earthwork, blanketing, FOB, Minor Bridge, Major bridge, other service buildings & H/L platform between Hodal to Palwal stations in connection with 4th line between Mathura-Palwal stations.

Railway portion

Construction of Railway Portion of 3 Nos. ROBs (excluding approaches) in lieu of level crossings for LC No. 138 at IR chainage 1395/13-15, LC No.145 at IR Chainage 1410/25-27 and LC No. 146 at IR Chainage 1412/11-13 and Approach Portion of 1 No. ROB (excluding Railway Portion) in lieu of level crossing for LC no. 140/C at IR chainage 1400/17A – 1400/22 between Wair and Dadri stations on Khurja-Dadri Section of Allahabad Division of North Central Railway for Eastern Dedicated Freight Corridor

Doubling of Railway Track

Doubling of Railway Track between Ludhiana and Kila Raipur (17.174 Km) including 25 kV High Rise OHE Railway Electrification and Signaling & Telecommunication works on Engineering Procurement & Construction (EPC) mode

Supplying, Laying and Linking

Supplying, Laying and Linking of P-Way works including Earthwork in Formation, Construction of Major Bridge, Minor Bridges, Buildings and other allied works From Ch +5.000 km to +14.000 Km at Khurja STPP near Danwar railway station in Dist. Bulandshahar (U.P.)
Other Projects

Explore additional significant projects that demonstrate our wide-ranging capabilities and consistent delivery across diverse sectors.

Name of Work Contract Awarding Authority Agreement No. & Date Cost of Work (In CR.)
Manufacturing, supplying and stacking of 65mm size machine crushed track ballast as per RDSO’s specification of June/2004 with up-to-date correction slips along the side of track between Km. 00/0 to 84/1 between Pilibhit (incl.) to Shahjahanpur (including) in connection with gauge conversion of Pilibhit-Shahjahanpur section.
Dy. Chief Engineer/Con, Izatnagar
CAO/CON/GKP 1847 dt: 16.11.2018
45.01
Manufacturing, supplying and stacking machine crushed stone ballast as per RDSO’s specification of June/04 for track ballast with upto date correction slips from Private quarry (Dalla/Billi/Maihar/Jhansi) as per direction of Engineer incharge from Km.60/0 to 100/4-5 between Biswan(incl) to Sitapur Katchehry(incl) section in connection with Burhwal-Sitapur doubling.
North Eastern Railway
CAO/Con/GKP/1851 dt:29.11.2018
35.80
Supply, Stacking Loading of 50,000 (Fifty Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-01 at TKD.
Northern Railway
06/18-19 dt 10/2019 of Sr. DEN-C dated 01.10.2018
6.80
Supply, Stacking Loading of 40,000 (Forty Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-04 at TKD.
Northern Railway
07/17-18 dt 03/2018 dated 28.02.2018
5.55
Supply, Stacking Loading of 60,000 (Sixty Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-02 at SKB.
Northern Railway
02/16-17 dated 01.09.2016
8.21
Supply, Stacking Loading of 25,000 (Twenty-Five Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-04 at TKD.
Northern Railway
02/19-20 dated 06.08.2019
2.80
Supply, Stacking Loading of 50,000 (Fifty Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-02 at TKD..
Northern Railway
03/18-19 dt 05/2018 dated 23.04.2018
6.39
Supply, Stacking Loading of 30,000 (Thirty Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-03 at TKD.
Northern Railway
09/18-19 dated 01.03.2019
3.13
Supply, Stacking Loading of 50,000 (Fifty Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-01 at SSB.
Northern Railway
02/18-19 dated 23.04.2018
5.59
Supply, Stacking Loading of 30,000 (Thirty Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-02 at SSB.
Northern Railway
08/18-19 dated 01.03.2019
2.67
Supply, Stacking Loading of 15,000 (Fifteen Thousand) cum 65mm Gauge Stone Ballast (Machine crushed) in to Railway Wagon including all lead and lift at Sub Depot-03 at SSB.
Northern Railway
04A/17-18 dated 28.12.2017
1.68
Manufacturing, supplying & stacking of 60,900 cum Machine Crushed Stone ballast at KRJ Depot under DEN/T/MB
Northern Railway
180/DRM/MB/T dated 09.06.2020
7.34
Manufacturing, supplying & stacking of 66,500 cum Machine Crushed Stone ballast at Lalkuan Station.
North Eastern Railway
E/78/TC dated 04.11.15
6.11
Manufacturing, supplying & stacking of 40,000 cum Machine Crushed Stone ballast at Madhosingh Station.
North Eastern Railway
DRM/W/143/2019 dated 19.12.19
11.67
Manufacturing, supplying and stacking machine crushed stone ballast as per RDSO’s specification of June/04 for track ballast with up-to-date correction slips from private quarry (Dalla /Billi/ Maihar / Jhansi) as per direction of Engineer incharge from Km.22/0 to 60/0 between Tehsil Fatehpur to Biswan(excl) section in connection with Burhwal -Sitapur doubling
North Eastern Railway
CAO/Con/GKP/1932 dated 19.06.19
19.79
faq

the most question we had

Find quick answers to common questions about our services, process, and project approach. Our FAQ section helps you understand how we work and what you can expect when partnering with Creative Minerals.

We specialize in road construction, bridge works, tunnel projects, tracks, and earthwork solutions using modern engineering techniques.

We follow strict quality control processes, use reliable materials, and maintain industry-standard engineering practices.

Yes, safety is a top priority. We adhere to all required safety regulations and implement safe working practices on-site.